![DSC00008](https://per-eng.com/wp-content/uploads/2024/06/DSC00008.jpg)
![DSC00007](https://per-eng.com/wp-content/uploads/2024/06/DSC00007.jpg)
![0604_1718-C-2-2cropped](https://per-eng.com/wp-content/uploads/2024/06/0604_1718-C-2-2cropped.jpg)
![DSC00689](https://per-eng.com/wp-content/uploads/2024/06/DSC00689.jpg)
![DSC00691](https://per-eng.com/wp-content/uploads/2024/06/DSC00691.jpg)
COMMERCIAL SITE EXPANSION
West Linn, OR
Tanner Springs Assisted Living
Tanner Springs Assisted Living facility expanded their campus to include an on-site memory care addition. Worked closely with the architect and owners to meet City of West Linn requirements. Careful planning allowed the site improvements without a significant impact to the existing facility. Civil Engineering tasks included roadway improvements, parking, utilities, and storm water quality design.
CATEGORY: Commercial
TAGS: Design, Permitting, Storm Water Quality, Sustainability, Utilities
Here are just a few of his projects he's completed over the years.
![](https://per-eng.com/wp-content/uploads/2024/06/DetroitRanger2-370x440.jpg)
DETROIT RANGER STATION
Served as manager for the design team for this award winning Ranger Station in the Willamette National Forest.
![](https://per-eng.com/wp-content/uploads/2024/06/Helens-view-sign-370x440.jpg)
ELK ROCK VIEWPOINT
![](https://per-eng.com/wp-content/uploads/2024/06/2004-06-07-005-370x440.jpg)
TONGUE POINT WATER SYSTEM
Construction assistance included facilitating training of Job Corps students in the use of an HDPE pipe welding machine.
![](https://per-eng.com/wp-content/uploads/2024/06/01-1-370x440.jpg)
FLOODPLAIN MANAGEMENT
Site improvements for the Larson Marina included power upgrades, sewer system reconstruction, and access controls.